Northern HV - Logo

Case Studies

Showing 1 - 4 of 4 Case Studies

Confidential Utility Client

UK Grid Substation

400/33kV 60MVA Transformer Installation & Commissioning

Northern HV delivered full installation and commissioning of a 400/33kV 60MVA power transformer at a UK grid substation. Vacuum oil filling, IEC 61850 protection integration, and energisation on schedule — over 8,000 man-hours without incident.

Learn more

Confidential UK Transmission Operator

275kV Grid Substation, UK

275kV Disconnector Earth Switch Installation and Commissioning

Northern HV installed and commissioned a 275kV disconnector earth switch at a live UK transmission substation. Delivered within the planned outage window with zero lost time incidents.

Learn more

Confidential UK DNO / ICP

UK Grid Substation

145kV Eco-Efficient Circuit Breaker Installation & Commissioning

Northern HV installed and commissioned a Hitachi Energy LTA 145D1 145kV circuit breaker using eco-efficient CO₂ gas technology. Full mechanical, electrical, and gas handling works delivered within a constrained outage window.

Learn more

Confidential UK DNO / ICP

132kV Primary Substation, UK

132kV Circuit Breaker Maintenance & SF₆ Gas Analysis

Northern HV carried out planned maintenance on a 132kV live tank SF₆ circuit breaker at a UK primary substation. Full hydraulic system service, timing tests, and gas quality analysis — returned to service with zero gas loss.

Learn more