Showing 1 - 5 of 5 Case Studies

Barclays Innovation Centre

Knutsford, UK

HV Cable Termination Repair at Barclays Innovation Centre, Knutsford

Northern HV was appointed to carry out essential high voltage cable repairs at the Barclays Innovation Centre in Knutsford following the need to replace a damaged section of cable between the Ring Main Unit (RMU) and transformer.

Learn more

Confidential UK DNO / ICP

132kV Primary Substation, UK

132kV Circuit Breaker Maintenance & SF₆ Gas Analysis

Northern HV carried out planned maintenance on a 132kV live tank SF₆ circuit breaker at a UK primary substation. Full hydraulic system service, timing tests, and gas quality analysis — returned to service with zero gas loss.

Learn more

Confidential Utility Client

UK Grid Substation

400/33kV 60MVA Transformer Installation & Commissioning

Northern HV delivered full installation and commissioning of a 400/33kV 60MVA power transformer at a UK grid substation. Vacuum oil filling, IEC 61850 protection integration, and energisation on schedule — over 8,000 man-hours without incident.

Learn more

Confidential UK Transmission Operator

275kV Grid Substation, UK

275kV Disconnector Earth Switch Installation and Commissioning

Northern HV installed and commissioned a 275kV disconnector earth switch at a live UK transmission substation. Delivered within the planned outage window with zero lost time incidents.

Learn more

Confidential UK DNO / ICP

UK Grid Substation

145kV Eco-Efficient Circuit Breaker Installation & Commissioning

Northern HV installed and commissioned a Hitachi Energy LTA 145D1 145kV circuit breaker using eco-efficient CO₂ gas technology. Full mechanical, electrical, and gas handling works delivered within a constrained outage window.

Learn more